Skip to main content

Industries · Fuel & Energy Systems

Control electronics for fuel distribution and energy

In fuel distribution, a metering error costs money and a safety failure costs far more. We designed, installed and commissioned an industrial fuel pump controller deployed across multiple sites: precise flow measurement, automatic safety shutoffs and data logging for compliance reporting.

  • 24-48hTechnical response
  • FreePreliminary study
  • NDAAvailable on request
  • LocalSMT assembly in Algeria

What this sector demands

Metering accuracy

Every litre counts: flow sensor acquisition, calibration and calculation designed for an exact, verifiable measurement.

Safety

Interlocks and automatic shutoffs on any anomaly, with predictable behaviour when a sensor or the supply fails.

Traceability

Timestamped records of operations and events, usable for compliance reports and inspections.

Multi-site estates

One system rolled out across several sites, installed, commissioned and supported over time.

What we build

  • Fuel pump controllers
  • Flow metering
  • Safety interlocks and shutoffs
  • Compliance data logging
  • Operator HMI
  • On-site installation and commissioning

Reference work

Energy Systems

Industrial Fuel Pump Controller

Custom controller for high-volume fuel dispensing systems with precision flow measurement, automated safety shutoffs, and data logging for compliance reporting.

Technologies Used

  • Industrial PLC
  • Flow Sensors
  • Safety Systems
  • HMI Interface

Deliverables

  • Complete System Design
  • Installation & Commissioning
  • Compliance Data Logging
  • Multi-Site Deployment

Services involved

Frequently asked questions

Are your systems certified for explosive atmospheres?
Hazardous-area requirements depend on the installation zone and apply to the equipment installed there. Give us your site's classification at the study stage: we build it into the architecture — electronics kept outside the zone, certified equipment specified, documentation — and we tell you plainly when certified off-the-shelf equipment is the right answer.
Do you install on site?
Yes. For our fuel pump controller we handled installation, commissioning and rollout across multiple sites.
Can you bring data back from several sites?
Yes. Local logging can be extended with remote reporting — GSM, LoRa or the site network — into a shared dashboard.

Where we work

Our design office and assembly workshop are in Tidjelabine, Boumerdès, an hour east of Algiers. We work with manufacturers, utilities and equipment makers across the country — technical exchanges happen remotely, and we come to site when the project needs it.

Clients across

  • Alger
  • Boumerdès
  • Blida
  • Tizi Ouzou
  • Oran
  • Constantine
  • Sétif
  • Annaba
  • Béjaïa

Producing locally removes import lead times, customs delays and currency exposure from your production runs.

Describe your installation

An engineer reviews your requirement and replies within 24-48h. No obligation.

Get a quote

No obligation. An engineer replies within 24-48h.